7 - 1
7
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION 
TO CPU
4
COMPUTER LINK 
CONNECTION
5
MELSECNET/10 
CONNECTION (PLC TO 
PLC NETWORK)
6
CC-Link CONNECTION 
(INTELLIGENT DEVICE 
STATION)
7
CC-Link CONNECTION 
(Via G4)
8
ETHERNET 
CONNECTION
CC-Link 
CONNECTION
(Via G4)
7.1 System Configuration  . . . . . . . . . . page 7-2
This section describes the equipment and cables needed
for CC-Link connection (via G4).
Select a system suitable for your application.
7.2 Preparatory Procedures for Monitoring . . . .
 . . . . . . . . . . . . . . . . . . . . . . . . . . . page 7-5
This section describes the procedures to be followed 
before monitoring in CC-Link connection (via G4).
The procedures are written on the step-by-step basis so 
that even a novice GOT user can follow them to start 
communications.
7.3 PLC Side Settings . . . . . . . . . . . . page 7-18
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
7.4 List of Functions Added by Version Upgrade
 . . . . . . . . . . . . . . . . . . . . . . . . . . page 7-23
This section describes the functions added by version 
upgrade of GT Designer2 or OS.