13.3  Preparatory Procedures for Monitoring
13.3.7  Checking for normal monitoring
13 - 25
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HIATACHI PLC
14
CONNECTION TO 
MATSUSHITA PLC 
15
CONNECTION TO 
YASKAWA PLC 
16
CONNECTION TO 
YOKOGAWA PLC
2 Perform an I/O check
Whether the PLC can communicate with the GOT or not can be checked by the I/O check function.
If this check ends successfully, it means correct communication interface settings and proper cable 
connection.
Display the I/O check screen by [Main Menu]   [Debug & self check]   [Self check]   [I/O check].
For details on the I/O check, refer to the following manual:
 GT   User's Manual
3 Confirming the PLC side setting
When connecting the GOT, setting is required for the PLC side.
Confirm if the PLC side setting is correct.
 Section 13.4 PLC Side Setting
1 Touch [CPU] on the I/O check screen.
Touching [CPU] executes the 
communication check with the 
connected PLC.
2 When the communication screen 
ends successfully, the screen on the 
left is displayed.
All settings related to communications are complete now.
Create screens on GT Designer2 and download the project data again.