23.3  Preparatory Procedures for Monitoring
23 - 15
17
CONNECTION TO 
ALLEN-BRADLEY PLC
18
CONNECTION TO 
SIEMENS PLC
19
MICROCOMPUTER 
CONNECTION
20
CONNECTION TO OMRON 
TEMPERATURE 
CONTROLLER
21
CONNECTION TO 
YAMATAKE TEMPERATURE 
CONTROLLER
22
CONNECTION TO RKC 
TEMPERATURE 
CONTROLLER
23
CONNECTION TO 
FREQROL SERIES 
INVERTER
24
SERVO AMPLIFIER 
CONNECTION
23.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Confirming the inverter side setting
This section explains the GOT side setting.
When confirming the inverter  side setting, refer to the following.
 Section 23.4 FREQROL Series Inverter Side Settings
Install the OS onto the GOT.
Section 23.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 23.3.2
Checking OS installation on GOT
Set the communication interface. (Communication 
settings)
Section 23.3.3
Setting communication interface 
(Communication settings)
Download the project data.
Section 23.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 23.3.5
Attaching communication unit and 
connecting cable
Make sure that the GOT recognizes the connected 
equipment.
Section 23.3.6
Verifying GOT recognizes connected 
equipment
Make sure that monitoring is performed normally.
Section 23.3.7
Checking for normal monitoring