3
3.31
9925723 R01 - 2015 RZR 900 Service Manual
© Copyright 2014 Polaris Industries Inc.
15.Connect the following electrical components:
Differential Relay (if equipped)
16.Install the ignition coil. Connect the wiring leads and
spark plug caps. Torque mounting bolts to
specification.
Ignition Coil Mounting Bolts:
75 in-lb (9 Nm)
17.Install the 22 Torx screws retaining the cargo box
panel. Torque screws to specification.
Cargo Box Screws:
8 ft-lb (11 Nm)
18.Install the two bolts mounting the air box to the frame
bracket