Inverter with CU230P-2 Control Units
Operating Instructions, 11/2013, FW V4.6.6, A5E02430659B AG
73
Commissioning guidelines
Procedure
Proceed as follows to commission the inverter:
Define the requirements of
your application placed on
the drive.
→ (Page 74).
Reset the inverter when
required to the factory
setting.
→ (Page 79).
Check whether the factory
setting of the inverter is
appropriate for your
application.
If not, start with the basic
commissioning.
→ (Page 80).
Check whether you need to
adapt the functions of the
terminal strip that you
specify in the basic
commissioning.
→ (Page 93).
If necessary, adapt the
communications interface in
the inverter.
→ (Page 107).
If necessary, set further
functions in the inverter.
→ (Page 225).
Save your settings.
→ (Page 323).
You have commissioned the inverter.