EasyManua.ls Logo

USTER HVI 900 - Weaving Efficiency

USTER HVI 900
340 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USTER®
HVI 900
Instruction Manual
Uster Technologies, Inc..
Chapter 9
Version 4.0 (1.99) HVI Applications - Page 9-8
5.7 Weaving Efficiency
The efficiency of weaving is affected by the speed of modern looms.
The attached graph indicates a Picks Per Minute (PPM) increase from
300 to 600. This results in a decrease in overall efficiency from 95.5 %
to 91.0 %. In addition, the corresponding weft breaks are indicated.
This information was obtained from European Weaving mills, which
produce various products (source: Sulzer-Ruti, Switzerland).

Table of Contents