1128600 SmartPAC 2 with WPC 2000 Integration User Manual
2-2 Installation
ELECTRIC SHOCK OR HAZARDOUS ENERGY
• Disconnect main power before installation.
• Remove all power to the press, press control, and other equipment used with the press.
• Remove all fuses and “tag out” per OSHA 1910.147 Control of Hazardous Energy (Lockout/
Tagout).
• Ensure that installation is performed by qualified personnel.
• Complete all wiring procedures before connecting to the AC power source.
Failure to comply with these instructions will result in death or serious injury.
PROGRAMMABLE CAM SWITCH NOT FOR SAFETY USE
Use SmartPAC 2’s programmable cam switch to control auxiliary functions only. The SmartPAC 2
programmable cam capability should never be used to provide timing signals for any safety use
including clutch/brake control or muting of light curtains.
Failure to comply with these instructions will result in death or serious injury.
OPTIONAL MODULES PROCAMPAC AND DIPROPAC INCLUDED IN MANUAL
When you order your SmartPAC 2 with WPC 2000 system, you may include the DiProPAC die
protection and/or ProCamPAC programmable cam switch option. This manual includes
instructions for installing and using both modules. Remember that they are options and might not
be included in your system.
If you ordered SmartPAC with other optional modules such as AutoSetPAC load monitor or
ProPAC process monitor, refer to the user manual for that option for complete details on its
installation and use.
UPGRADING FROM ORIGINAL SMARTPAC
See Appendix F for instructions on upgrading from original SmartPAC to SmartPAC 2.
READ INSTALLATION INSTRUCTIONS BEFORE STARTING INSTALLATION
If you install WPC 2000 and SmartPAC 2 yourself, read this installation chapter carefully, plan your
installation, and figure out what steps you will follow before you start drilling holes, running conduit,
or cutting wires.
When you have completed installation procedures, perform the tests in the Performing Checkout
Tests section, page 2-87 to ensure that WPC 2000 and SmartPAC 2 are installed correctly and
working properly before proceeding to the Initialization (Chapter 4), Program (Chapter 5), and Run
(Chapter 6) chapters.