1128600 SmartPAC 2 with WPC 2000 Integration User Manual
2-20 Installation
Wiring an Unwired Operator Station
To wire the unwired Wintriss Operator Station, follow the wiring diagram in Figure 7 at the
end of this manual. Before using your press, be sure to check the wiring carefully, run all the
applicable verification and checkout tests, and calculate the safety distance. You can then
mount the Operator Station in a permanent location, referring to Figure 2-12 for mounting
dimensions.
OPERATOR STATION MAY NOT MEET SAFETY REQUIREMENTS
• Ensure that the Operator Station is wired correctly.
• Run all necessary tests to verify that each Operator Station is wired correctly and provides
proper anti-tie-down and anti-repeat protection. Test procedures are provided at the end of this
chapter (see page 2-87).
Failure to comply with these instructions will result in death or serious injury.
Figure 2-12. Unwired Operator Station: Mounting Dimensions
Dimensions:
inches
(mm)
PRIOR
ACT
INTRISS
W
TOP
STOP
5.8
(148)
REF
4.69
(119.1)
16.75
(425.5)
R
U
N
/
I
N
C
H
R
U
N
/
I
N
C
H
5.50
(139.7)
21.25
(539.8)
E
M
E
R
G
E
N
C
Y
S
T
O
P