22.4.5.2 Mounting procedure for side-by-side flush mounting
M12730-6 v4
1
2
3
4
IEC06000181-2-en.vsd
IEC06000181 V2 EN-US
Figure 405: Side-by-side flush mounting details (RHGS6 side-by-side with 1/2 x
19” IED).
The required torque for the screws is 3.5 Nm.
PosNo Description Quantity Type
1 Mounting plate 2 -
2, 3 Screw, washer 16 M4x6
4 Mounting angle 2 -
22.5 Technical data
IP16276-1 v1
22.5.1 Enclosure
IP16278-1 v1
M11778-1 v6
Table 645: Case
Material
Steel sheet
Front plate Stainless steel with cut-out for HMI
Surface treatment Aluzink preplated steel
Finish Light grey (RAL 7035)
1MRK 505 394-UEN A Section 22
IED hardware
Line differential protection RED650 2.2 IEC 859