EasyManua.ls Logo

Fujitsu PRIMERGY RX2520 M5

Fujitsu PRIMERGY RX2520 M5
508 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note for servers using CMA (Cable Management Arm)
Regarding of removing PSUs, additional tasks are needed, due to an
interference between CMA and the PSUs.
If applicable, open the CMA of the server below to get enough space at the
under side of your server.
Unlock the CMA stopper of the server below
.
Pull out the CMA of the server below to the rear side.
Push the lock spring inward to unlock the CMA bracket, see Figure 26.
Remove the CMA.
Hold the CMA including cables in the one hand.
Remove the PSU (see Figure 28) and install the new PSU carefully.
Mount the complete assembly (CMA bracket and the CMA) again into the
rail.
If applicable, close the CMA of the server below.
Preliminary steps
"Locating the defective server" on page 43.
Check which PSU is defective.
PSU is defective when the PSU status indicator lights orange. For more
information, see "Indicator on hot-plug PSU" on page 455.
Only when replacing a PSU in a non-redundant configuration: "Shutting
down the server" on page 45.
Remove the power cord from the defective PSU, see "Disconnecting the
power cord" on page 46.
Removing the defective hot-plug PSU
Remove the PSU, see "Removing a hot-plug PSU" on page 110.
Installing the new hot-plug PSU
Install the PSU, see "Installing a hot-plug PSU" on page 105.
Power supply unit (PSU)
112 Upgrade and Maintenance Manual RX2520 M5

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2520 M5

Related product manuals