EasyManua.ls Logo

GE Definium 5000 - Page 214

GE Definium 5000
250 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 11: Quality Assurance Process and Maintenance
Definium 5000 X-Ray System 5197809-1EN Rev. 4 (13 February 2008) 11-10
Operator Manual © 2008 General Electric Company. All rights reserved.
Result History
After QAP is complete, the system generates a test summary page. The result summary table contains
descriptive names, measured values, test specifications (LSL and/or USL) and pass/fail status.
A minimum of 25 QAP test results are maintained.
Follow this process to view the results of previous QAP tests.
1. From the left pane, press [RESULT HISTORY].
The Result History screen appears.
2. Press a test entry in the list to select it.
3. Press [SELECT].
The test details appear.
Figure 11-17 QAP Result History screen
FOR TRAINING PURPOSES ONLY!
NOTE: Once downloaded, this document is UNCONTROLLED, and therefore may not be the latest revision. Always confirm revision status against a validated source (ie CDL).

Table of Contents

Related product manuals