Chapter 8 Replacement Procedures 8-103
8-23-4 Console Lock Assembly Removal Procedure
1.) Unscrew 8 (5 mm) and 2 (3 mm) hexagon screws (See Figure 8-113).
2.) Take care of the spring.
3.) Remove the Console Lock Assembly.
8-23-5 Console Lock Assembly Installation Procedure
1.) Install the Lock Assembly.
2.) Install the spring.
3.) Fasten the 10 hexagon screws.
4.) Install Operator Panel.

Table of Contents

Other manuals for GE LOGIQ 9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 9 and is the answer not in the manual?

GE LOGIQ 9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 9
CategoryMedical Equipment
LanguageEnglish

Related product manuals