EasyManuals Logo

GE LOGIQ 9 User Manual

GE LOGIQ 9
570 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #457 background imageLoading...
Page #457 background image
GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARY MANUAL
Chapter 8 Replacement Procedures 8-159
Section 8-41
Frogleg Replacement Procedure
8-41-1 Manpower
2 persons, 3 hours
8-41-2 Tools
Hexagon key, 10 mm, with torque/momentum controller
Hexagon keys, 4, 5 and 6 mm
Phillips screwdriver, size 2 and 3
8-41-3 Preparations
1.) Shut down the system as described in Power Off / Shutdown on page 4-3.
2.) Move Top Console to down position.
3.) Remove monitor as described in Monitor Assembly Replacement Procedure on page 8-92.
4.) Unscrew two (2) hexagon screws to loosen the Console Cable Neck from the Frogleg.
5.) Unscrew four (4) screws on the Upper Column Cover.

Table of Contents

Other manuals for GE LOGIQ 9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 9 and is the answer not in the manual?

GE LOGIQ 9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 9
CategoryMedical Equipment
LanguageEnglish

Related product manuals