EasyManua.ls Logo

GE LOGIQ 9 - Back-End Processor Boot up; Power Off; Shutdown; Back-End Processor Power down

GE LOGIQ 9
570 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARY MANUAL
Chapter 3 Installation 3-7
3-5-1-2 Back-end Processor Boot Up
Press the Standby switch on the Control Panel once.
When the Standby switch on the Control Panel is pressed once, the Back-end Processor starts and the
software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3-5-2 Power Off/ Shutdown
NOTE: After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1 Back-end Processor Power Down
1.) Press the Standby switch on the Control Panel once to display the SYSTEM - EXIT menu.
2.) Select Shutdown from the SYSTEM - EXIT menu.
Figure 3-4 Standby Switch for Back-end Processor Boot Up
Figure 3-5 System Exit Menu for Back-end Processor Power Down
Standby Switch

Table of Contents

Other manuals for GE LOGIQ 9

Related product manuals