GE MEDICAL SYSTEMS PROPRIETARY TO GE
D
IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARY MANUAL
8-110 Section 8-26 - Upper Operator Panel Replacement Procedure
8-26-5 Upper Operator Panel Installation Procedure
1.) Install the new Upper Operator Panel.
2.) Connect the 5 ribbon cables (A-E).
3.) Connect the small wire and wire bundle to the back of the Upper Operator Panel.
4.) Attach the Video Cable to the back of the Upper Operator Panel.
5.) Secure the wires from the Upper Operator Panel into the cut-out area behind the Upper Operator
Panel.
6.) Install the two (perhaps 4) screws that secure the Upper Operator Panel to the ultrasound frame.
7.) Slide the Under Shelf Cover back into place and secure in place with the Phillips screws
8.) Secure the Under Shelf Cover to the Shelf Cover Assembly with the two Phillips screws.

Table of Contents

Other manuals for GE LOGIQ 9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 9 and is the answer not in the manual?

GE LOGIQ 9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 9
CategoryMedical Equipment
LanguageEnglish

Related product manuals