715
To remove all files from the Gerber Queue Manager
1 In the GQMgr work space, select the output device that contains the files to be
removed.
2 Click Terminate to open the GQMgr message box.
3 Click OK. All files listed for the selected output device will be deleted from the queue.
Changing the job order
Gerber Queue Manager allows you to change the order of jobs waiting to be sent to an output
device.
To change the job order
1 In the GQMgr work space, select the file that you want to send next to the output
device.
2 Click Do Next.
Tip: If a design is currently being output, the moved file appears second in line in the queue.
Viewing plotter properties in GQMgr
Right-click a plotter in the list of installed output devices and select Properties to display the
Properties for Plotter dialog box. The Properties dialog box contains the plotter’s unique Name,
current Status, Protocol, and Port information, which you can edit or save as a Preference.
Several examples are shown below.
The List button in the Properties dialog box of a USB device opens the Select USB Vendor and
Product ID dialog box where you can choose the plotter and its Vendor and Product ID codes.