EasyManuals Logo

Manitowoc GROVE GMK5150L User Manual

Manitowoc GROVE GMK5150L
1040 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #341 background imageLoading...
Page #341 background image
Driving modes and rigging for on-road driving
6.6 Installing/removing the outrigger beams
Operating manual 3 302 709 en 6 - 59
GMK5150L
12.01.2018
Attaching the
outrigger pads
After mounting the outrigger beam, you must attach the outrigger pad.
• (A) – Remove the pin (1).
• Extend the outrigger cylinder far enough so
that the bearing surface (3) is below the
guide (2).
• Push the outrigger pad onto the outrigger
cylinder.
• Move the outrigger pad into required posi-
tion.
– On site, move it to the working posi-
tion (B).
– If you need to drive to the site, in driving
position (C).
• Insert the pins (1) and secure them.
Securing pin
• Plug the pin with the peg (1) through the
cutout (2).
• Turn the grip (3) downward.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK5150L and is the answer not in the manual?

Manitowoc GROVE GMK5150L Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK5150L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals