Transport
7.2 Transport by ship
7 - 6 3 302 709 en Operating manual
GMK5150L
12.01.2018
7.2 Transport by ship
• Secure the truck crane with the chocks (1).
• Fasten the lifting gear to the slinging
points (2) on both sides. Ensure that
no attachments, cables or hoses are
damaged in this process.
Additional slinging points are usually neces-
sary when the truck crane is transported on
a ship.
• If necessary, use additional points as
slinging points.
G
Risk of accidents due to falling parts
Use only suitable lifting gear with sufficient load bearing capacity and use
only the slinging points provided.
1 Main boom head
2 Main hoist