Malfunctions during crane operation
14.2 What to do when malfunctions occur during crane operation
14 - 2 3 302 709 en Operating manual
GMK5150L
12.01.2018
14.2 What to do when malfunctions occur during crane
operation
Pay attention to the following points if a malfunction occurs:
Keep calm!
The load can be
set down
Set down the load. Retract the main boom completely and set it down on
the main boom rest.
If it becomes necessary to override the RCL, observe all the information in
the section titled
RCL override.
à RCL override – version A, p. 11 - 63.
à RCL override – version B, p. 11 - 67
If it is no longer possible to operate the crane from the crane cab, you can
use the emergency activation, if necessary;
à Emergency operation with the hand-held control, p. 14 - 43,
à Hydraulic emergency operation with the hand pump, p. 14 - 51.
Lock the truck crane to prevent unauthorised use. Remove the ignition key
and lock away the hand-held control.
Inform your supervisor.
Try to eliminate the malfunction. Inform Manitowoc Crane Care if you
cannot correct the malfunction.
Load cannot
be set down
Secure the danger area using cordons and warning signs.
Notify Manitowoc Crane Care.
G
Risk of accidents when carrying out repairs with loads lifted
Repairs must not be carried out as long as a load is lifted.
Always try to lower the load before carrying out repairs.
Only properly qualified personnel may perform crane movements with the
solenoid valves.
G
Risk of accidents due to overridden or faulty RCL
You may override the RCL only if it becomes absolutely necessary to do so
in the event of an emergency. This is to put the truck crane into a safe state
in the event of a malfunction. In this case, do not perform any movements
that would increase the load moment.