EasyManua.ls Logo

Manitowoc GROVE GMK5150L

Manitowoc GROVE GMK5150L
1040 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating elements for crane operation
9.1 Overview of the operating elements
Operating manual 9 - 5
GMK5150L
18 Outriggers:
Control units
1)
Control units for raising the axles
Emergency stop switch
à p. 9 - 85
à p. 9 - 85
à p. 14 - 1
19 Slinging points
For personal protective clothing
For fall protection device
1)
à p. 12 - 151
à p. 12 - 151
20 Railings on the turntable
à p. 12 - 149
21 CraneSTAR system
à p. 11 - 158
22 Drive unit
2)
23 Switching on the boom floating position
1)
Switching off the boom floating position
1)
à p. 6 - 13
à p. 12 - 19
24 Switching on boom pre-tensioning
1)
Switching off boom pre-tensioning
1)
à p. 6 - 14
à p. 12 - 21
25 Reeving and unreeving the hoist rope
à p. 12 - 124
26 Hook block
Separable hook block
1)
Hook block with ballast plates
1)
à p. 12 - 115
à p. 12 - 120
à p. 12 - 122
27 Fuel tank auxiliary heater
1)
à p. 11 - 5
28 Mirror for crane operation
à p. 12 - 150
29 Storage compartment
Anemometer
Hand-held control
à p. 12 - 145
à p. 12 - 23
30 Slewing gear:
operation
Switching off the slewing gear freewheel
1)
Switching on the slewing gear freewheel
1)
Turntable lock
1)
à p. 11 - 115
à p. 12 - 20
à p. 6 - 13
à p. 9 - 129
31 Hydraulic oil cooler, second cooler
1)
32 Main hoist à p. 9 - 114
33 Auxiliary hoist Operation
1)
Rigging the auxiliary hoist
1)
à p. 9 - 116
à p. 6 - 39
1)
Additional equipment
2)
à Maintenance manual

Table of Contents

Related product manuals