EasyManua.ls Logo

Manitowoc GROVE GMK5150L

Manitowoc GROVE GMK5150L
1040 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crane operation
11.4 Operation of the rated capacity limiter
Operating manual 3 302 709 en 11 - 39
GMK5150L
12.01.2018
The confirmed boom system (1) or (2) is
displayed.
Reeving
(A) – Select and confirm the display for the
hoist to be used for lifting the load, for
example, display (1) for the main hoist –
symbol (3) is orange.
(B) – Select the currently rigged reeving (2),
e.g. 8-fall.
Confirm the selection and leave the
display (1) – symbol (3) grey.
s

Table of Contents

Related product manuals