Page 23Alterations reserved Stand 12/02
Operating Manual
T 700 / T 800 - FP ENG
3.2.3 Pressure / Vacuum pump
Put the vacuum and air tubes onto
the matching connection pieces 1
which are marked in colour.
>ATTENTION< Check before the
rotating field. If this is not correct,
it may cause essential damages
to the pump or to the feeder - head.
3.2.4 Double sheet control
Attach the double sheet control 1 with
screw 2 and the cable with screw 3.
Attach all protective hoods !
Insert the buckle plates, place the guide rails on, place the slitters onto the slitter shafts,
tension the transport tapes etc. All these works are described under the following paragraph
„ Operation of the Machine“.