6 - 38
6.3 PLC Side Setting
6.3.3 Connecting to CC-Link module (A Series)
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether
turning OFF and then ON or resetting.
Head No. of RX (RX0)
RY head number (RY0)
RX refresh destination (X)
No. of refresh points (32)
RX refresh destination
device head No. (400)
RY refresh destination (Y)
No. of refresh points (32)
RY refresh destination
device head No. (400)
RW head No. (RW0)
RW refresh destination (D)
RW refresh destination
device head No. (200)
SB head No. (SB0)
SB refresh destination (B)
No. of refresh points (512)
No. of refresh points (260)
SB refresh destination
device head number (0)
SW head number (SW0)
SW refresh destination (W)
No. of refresh points (512)
Dedicated instruction
(RRPA)
CC-Link module head
I/O No. (0000
H)
Parameter storage head
device (D100)
SW refresh destination
device head No. (0)