13.3 Preparatory Procedures for Monitoring
13 - 11
9
CONNECTION TO
OMRON PLC
10
CONNECTION TO
KEYENCE PLC
11
CONNECTION TO
SHARP PLC
12
CONNECTION TO
TOSHIBA PLC
13
CONNECTION TO
HIATACHI PLC
14
CONNECTION TO
MATSUSHITA PLC
15
CONNECTION TO
YASKAWA PLC
16
CONNECTION TO
YOKOGAWA PLC
13.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Confirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 13.4 PLC Side Setting
Install the OS onto the GOT.
Section 13.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 13.3.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 13.3.3
Setting communication interface
(Communication settings)
Download the project data.
Section 13.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 13.3.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 13.3.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 13.3.7
Checking for normal monitoring