15.3  Preparatory Procedure for Monitoring
15.3.1  Installing OS onto GOT
15 - 19
9
CONNECTION TO 
OMRON PLC
10
CONNECTION TO 
KEYENCE PLC
11
CONNECTION TO 
SHARP PLC
12
CONNECTION TO 
TOSHIBA PLC
13
CONNECTION TO 
HITACHI PLC
14
CONNECTION TO 
MATSUHSHITA PLC
15
CONNECTION TO 
YASKAWAI PLC
16
CONNECTION TO 
YOKOGAWA PLC
15.3.1 Installing OS onto GOT
Install the standard monitor OS, communication driver and option OS onto the GOT.
For the OS installation methods, refer to the following manual.
 GT Designer2 Version   Basic Operation/Data Transfer Manual
1 Check-mark a desired standard monitor OS, communication driver, option OS, and extended function 
OS, and click the   button.
Check the following under the Communication driver.
 • YASKAWA GL/CP9200(SH/H)/CP9300MS
Install