15 - 18
15.3 Preparatory Procedure for Monitoring
15.3 Preparatory Procedure for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Comfirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 15.4 PLC Side Setting
Install the OS onto the GOT.
Section 15.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 15.3.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 15.3.3
Setting communication interface
(Communication settings)
Download the project data.
Section 15.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 15.3.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 15.3.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 15.3.7
Checking for normal monitoring