Training Guide Course No. 196514
Level 2 Maintenance, X-1000 Series Dispensing Systems 4-55 P/N 196515 (Revision A)
Information Sheet 4-5-2
Troubleshooting Z-Axis Motion (Continued)
D. Troubleshooting Guidelines
1. A dispensing system in need of troubleshooting may have High Voltage
present in both designated and unsuspected places that can result in injury
or death. It is imperative to adhere to Safety Precautions outlined in the
Safety Section of this training guide.
2. Disconnect and lockout power to systems connected to the dispensing
system (such as loaders and ovens) before troubleshooting. Failure to do so
may result in serious injury or death.
3. Troubleshooting should only be performed by an Asymtek Field Service
Engineer or an Asymtek-trained service technician.
4. Problems resulting from environmental and applications abnormalities, spills,
obstructions, and workpiece irregularities not related to the system should be
eliminated before starting advanced system troubleshooting.