EasyManua.ls Logo

SENSTAR OmniTrax - Page 116

SENSTAR OmniTrax
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation of trenches
Page 116 OmniTrax Product Guide
4. Lay the sensor cable in the trench(es) or slots one cable at a time.
Figure 81: Laying lead-in cable
processor
enclosure
NOT TO SCALE
leave enough cable at the processor location to
form a 2 m service loop (if the ends of the lead-in
cables have been damaged or contaminated during
installation, cut off the damaged cable, minimum
lead-in length = 6 m)
align red bands
at start point of
detecting cable
position and secure the
ferrite beads
cable
reel

Table of Contents

Related product manuals