INSTALLATION
IN THIS SECTION, YOU'LL LEARN:
About the installation process required for this machine.
The installation of the base machine takes about four hours, not including items such as a Full Enclosure Kit, a
Power Drawbar, or an Automatic Tool Changer (ATC).
Note: For ease of installation, don't install the chip pans, backsplash/splash guard, enclosure, or
other accessories until after you've lifted the machine onto the Machine Stand.
Before operating the machine in any way, you must read and understand this section.