PROCEDURE
1 Attach two shackles (003, Figure 8-17) to the column.
2 Attach the two lever chain hoists (004) to the shackles (003).
3 Attach the two lever chain hoists (004) to the shackles (005) on the tool connecting rod
(009).
4 Apply Molyslip copaslip to the thread of the bolts (007).
5 Put the rods (006) into the connecting rod (002).
6 Operate the manual ratchets (004) to lift the tool (009) into position on the rods (006).
7 Tighten the nuts and bolts (008).
8 Torque the rods (006) to the correct value, refer to section 16.1 Tightening instructions.
Fig 8-17 Connecting rod
9 Operate the turning gear and lever chain hoists to lower the crosshead to BDC.
10 Attach the stop plate (002, Figure 8-18) to the bearing cover.
11 Attach the eye bolt (001) to the guide shoe.
X62DF
AA00-3303-00AAA-523A-A
Maintenance Manual Connecting rod - prepare before removal
Winterthur Gas & Diesel Ltd.
- 379 - Issue 002 2020-10