EasyManua.ls Logo

WinGD X62DF - Page 8

Default Icon
897 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11.2 Auxiliary blower
11.2.1 Auxiliary blower - remove.............................................634
11.2.2 Auxiliary blower - install.............................................. 640
11.3 Scavenge air cooler
11.3.1 Scavenge air cooler - remove.........................................646
11.3.2 Scavenge air cooler - install...........................................654
11.4 Water separator
11.4.1 Water separator - remove.............................................658
11.4.2 Water separator - install..............................................664
12 Group 7 - Cylinder lubrication and balancer
12.1 Cylinder lubrication system
12.1.1 Cylinder lubrication system - do a functional test.........................670
12.1.2 Cylinder lubrication system - bleed.....................................672
12.1.3 Cylinder lubricating pump - remove.................................... 676
12.1.4 Cylinder lubricating pump (MK-1) - examine.............................680
12.1.5 Cylinder lubricating pump - install......................................682
12.2 Integrated electric balancer (iELBA)
12.2.1 Integrated electric balancer - prepare before the bearings removal.........684
12.2.2 Integrated electric balancer - remove the bearing (engine side)............686
12.2.3 Integrated electric balancer - remove the bearing (outer side)............. 690
12.2.4 Integrated electric balancer - do a check of the bearing clearance..........694
12.2.5 Integrated electric balancer - adjust the bearings........................ 698
12.2.6 Electric balancer sensor unit - remove the proximity sensor............... 702
12.2.7 Electric balancer sensor unit - install the proximity sensor.................704
12.2.8 Integrated electric balancer - do a check of the backlash..................706
12.2.9 Integrated electric balancer - install the bearing (engine side)..............710
12.2.10 Integrated electric balancer - install the bearing (outer side)...............712
13 Group 8 - Pipes
13.1 HP servo oil pipe
13.1.1 HP servo oil pipe - remove............................................716
13.1.2 HP servo oil pipe - grind the sealing face............................... 720
13.1.3 HP servo oil pipe - install............................................. 724
13.2 Hydraulic pipe exhaust valve
13.2.1 Hydraulic pipe exhaust valve - remove................................. 728
13.2.2 Hydraulic pipe exhaust valve - grind the sealing face.....................732
13.2.3 Hydraulic pipe exhaust valve - install...................................736
13.3 HP fuel pipe
13.3.1 HP fuel pipe (fuel rail to injection valve) - prepare before removal..........740
13.3.2 HP fuel pipe (fuel rail to injection valve) - remove........................ 742
13.3.3 HP fuel pipe (fuel rail to injection valve) - grind the sealing face............744
13.3.4 HP fuel pipe (fuel rail to injection valve) - install..........................748
X62DF
Maintenance Manual
Winterthur Gas & Diesel Ltd.
- 8 - Issue 002 2020-10

Table of Contents

Related product manuals