EasyManua.ls Logo

Xerox WorkCentre 5225

Xerox WorkCentre 5225
1457 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
February, 2008
2-688
WorkCentre 5225, 5230
124-383, 124-390
Launch Version
Status Indicator Raps
124-383 CRUM Market System 2 (2)
CRUM control failed in system 2.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The connectors are securely
connected.
YN
Connect the connectors.
Turn on the power again. The problem persists.
YN
Return to Service Call Procedures.
Perform GP 4, repair the problem by master SYS2.
If the problem persists, replace the ESS PWB (PL 9.2).
124-390 OEM Market (2)
OEM (Original Equipment Manufacturer) CRUM control failed.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The connectors are securely
connected.
YN
Connect the connectors.
Turn on the power again. The problem persists.
YN
Return to Service Call Procedures.
Replace the ESS PWB (PL 9.2)
If the problem persists replace the MCU PWB (PL 9.1).

Table of Contents

Other manuals for Xerox WorkCentre 5225

Related product manuals