EasyManua.ls Logo

Barco DP2K-36BLP - Physical Installation Top Cooler

Barco DP2K-36BLP
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Physical installation top cooler
5. PHYSICAL INSTALLATION TOP COOLER
Thetubesarepre-filled with liquid. It is not possible to refill the coolers or tubes on site. Hence take care to
protect the tubes and quick con nectors.
Overview
• Assembling the housing
• Mounting the housing on the frame
• Mounting the front support
• Mount cooling frame on the projector
• Insert the cooler units
• Mount the fi lt ers
• Cabling an d tubing
5.1 Assembling the housing
Housing p arts
The hous ing parts are delivered as a flat pack and should be m ounted together at the custom ers side.
Image 5-1
R5906753 DPXK BLP SERIES 20/11/2017 37

Table of Contents