EasyManua.ls Logo

Barco DP2K-36BLP - Physical Installation Top Cooler

Barco DP2K-36BLP
185 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Physical installation top cooler
5. PHYSICAL INSTALLATION TOP COOLER
Thetubesarepre-lled with liquid. It is not possible to rell the coolers or tubes on site. Hence take care to
protect the tubes and quick con nectors.
Overview
Assembling the housing
Mounting the housing on the frame
Mounting the front support
Mount cooling frame on the projector
Insert the cooler units
Mount the lt ers
Cabling an d tubing
5.1 Assembling the housing
Housing p arts
The hous ing parts are delivered as a at pack and should be m ounted together at the custom ers side.
Image 5-1
R5906753 DPXK BLP SERIES 20/11/2017 37

Table of Contents

Related product manuals