5. Physical installation top cooler
5. PHYSICAL INSTALLATION TOP COOLER
Thetubesarepre-filled with liquid. It is not possible to refill the coolers or tubes on site. Hence take care to
protect the tubes and quick con nectors.
Overview
• Assembling the housing
• Mounting the housing on the frame
• Mounting the front support
• Mount cooling frame on the projector
• Insert the cooler units
• Mount the fi lt ers
• Cabling an d tubing
5.1 Assembling the housing
Housing p arts
The hous ing parts are delivered as a flat pack and should be m ounted together at the custom ers side.
Image 5-1
R5906753 DPXK BLP SERIES 20/11/2017 37