Installation
Install new o-rings on the plunger retainer plug. Lubricate
the o-rings with vegetable oil.
Install the plunger (4), the spring (3), the retainer plug (2)
and the capscrew (1).
Tighten the retainer plug capscrew.
Torque Value: 27 N•m [20 ft-lb]
Confirm that the oil level in the oil pan is to the full mark.
Operate the engine until the water temperature reaches
82°C [180°F]. Check the oil pressure, and check for oil
leaks.
Lubricating Oil Pump Signal Line
(2-16)
Removal
Remove the demand flow cooling (DFC) signal line.
Cleaning and Inspection
Caution: Wear safety goggles when using an air solvent
gun to prevent possible eye injury.
Clean the inside of the signal line and the 7/16-20 UNF
straight thread with o-ring seal adapter with solvent and
an air solvent gun.
Lubricating Oil Pump Signal Line (2-16) Section 2 - Lubricating System
N14Page 2-40