Installation
Install the DFC signal line. Tighten the signal line tube
nuts.
Torque Value: 14 N•m [120 in-lb]
Operate the engine until the water temperature reaches
82°C [180°F]. Check the oil pressure, and check for oil
leaks.
Lubricating Oil Pump Signal Line
Orifice (In Chassis) (2-17)
Removal
Warning: Carefully remove the capscrew. The pressure
regulator spring is under compression.
Remove the main oil pressure regulator plunger. Refer to
Procedure 2-15.
Remove the DFC signal line.
Remove the 7/16-20 UNF straight thread with o-ring seal
adapter from the lubricating oil pump cover.
Section 2 - Lubricating System Lubricating Oil Pump Signal Line Orifice (In Chassis) (2-17)
N14 Page 2-41