EasyManua.ls Logo

Evinrude E-tec 75 HP - Exhaust Housing Installation

Evinrude E-tec 75 HP
426 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
245
MIDSECTION
EXHAUST HOUSING, 40 – 65 HP
11
Exhaust Housing Installation
Bring the exhaust housing into positio n with the
stern bracket.
Apply Nut Lock to threads of the upper mount
screws. Install the screws and place ground lead
under t he cente r screw . Tighten screws to a
torque of 18 to 20 ft. lbs. (24 to 27 N·m).
Place lo wer thrust washer on th e stee ring shaf t
and place the lower front mount into position.
Install lower side mount covers. Install and tighten
the screws in stages to a torque of 16 to 18 ft. lbs.
(22 to 24 N·m) following sequence shown.
Install gearcase. Refer t o Gearcase GEARCASE
REMOVAL AND INSTALLATION on p. 296.
Install powerhead. Refer to Po werhead POWER-
HEAD INSTALLATION on p. 216.
Exhaust Housing 005069
1. Ground lead COA2943
1
1. Thrust washer
2. Lower front mount
17526
Torque sequence 17528
2
1
2
1
3

Table of Contents

Related product manuals