Constellation™ November 2003
Index-14
trap
community 6-10
destinations 6-9
enable/disable 6-10
management 6-10
repeat 6-10
tributary BER test
4-11
tributary loopback test
4-3
tributary remote loopback test
4-4
troubleshooting
guidelines 10-1
turning on
the power 3-8
the Power Supply switch 3-8, 3-24
Transmitter switch 3-8, 3-24
twisted-pair cable
6-2
two separate loop systems
D-6
U
unpacking procedure 2-2
unrepairable units
12-6
V
verify grounding 1-4
verifying RF output power
3-9
VersaT1lity port
9-4, A-9
location 3-15, A-8
pinouts A-10
VF port
9-4
VF ports
location 3-15, A-8
pinouts A-10
voltmeter, digital
11-3
VT100 terminal emulator
B-1
VT100-compatible terminal
1-20
W
warming up the Constellation 3-8, 3-25
warning labels
1-3
warnings
1-3
warranty
12-11
other equipment manufacturer 12-11
warranty period
12-11
watchdog
9-11
waveguide
flexible 3-21
grounding 3-21
installing 3-21
leaks 3-21
precaution 1-3
waveguide termination
3-20
wayside connector
9-4
wayside port
E1 specification A-11
E1, location 3-15, A-8
T1, location 3-15, A-8
T1/E1 pinouts A-10
Web site, Harris
10-1
wire size, power run
3-22