Harris Corporation Constellation™
SITE
PREPARATION
C HAPTER
2
SITE PREPARATION
Power Source
DC power source, 20 V to 60 V.
Equipment Rack Location
The equipment rack should be located in a sheltered area that provides proper
lighting, ventilation, and access to both the front and back of the Constellation
radio.
At least 3 feet of space must be between the equipment, strong magnetic fields,
and sources of impulse noise.
Equipment Inspection
Verify that the correct radio system is going to be installed.
• Each Constellation radio has been set up at the factory according to the
customer’s specifications. To configure a radio for a different
application, contact the Harris MCD
Technical Assistance Center
(TAC). See page xv.
• The Constellation radio is shipped fully assembled and ready to install.