Constellation™ November 2003
3-10 Installation and Commissioning
Summary of the Hop Test
Network Element Address
Obtain a network element address from the network manager.
Verify the configurations listed in Table 3-7 (through the Keypad).
Table 3-7: Hop test procedures
Step Procedure
For Details,
Go To
1
The system configuration through the Keypad. page 5-1
2
If applicable, the add-drop for a repeater system. page 5-8
3
Configure the network management (through the
Keypad).
page 6-1
page 7-1
4
The tributaries. page 5-10
5
The relay outputs. page 5-11
6
The Service Channel. page 5-12
7
The protection system.
page 5-4
page 5-7
8
Inform the network manager that the Constellation is
ready to be put into service.