EasyManua.ls Logo

Inficon HAPSITE ER - Page 62

Inficon HAPSITE ER
432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 - 2
HAPSITE ER Operating Manual
4 HAPSITE ER will begin to prepare various components. These components
include heating the HAPSITE and accessory heaters, running AutoTune (see
Step 8 on page 4-3), powering the NEG, and if necessary, running concentrator
cleanout.
5 During the preparation period, the front panel will display the PREPARING
SYSTEM message. Depending upon the chosen default method, this screen
may show PREPARING ANALYZE or PREPARING SURVEY. This message
will occur when the methods have different temperature setpoints. (See
Figure 4-2.)
Figure 4-2 Front Panel Preparing System
6 To view the preparation details’ progress, touch the Details button. (See
Figure 4-3.)
Figure 4-3 Details Button

Table of Contents

Related product manuals