EasyManuals Logo

Keysight N1911A User Manual

Keysight N1911A
287 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #263 background imageLoading...
Page #263 background image
Maintenance 10
Keysight N1911A/1912A User’s Guide 263
Instrument Self Test
If is selected, the following tests are run: (These are the same tests
which are run using the *TST? command.)
– Test Point Voltages
– Calibrator
–Fan
–Battery
– Channel Peak Path
– Channel CW Path
– Channel DAP Check
As each test takes place, the name of the test is listed on the screen. While a test
is running, the message Testing... appears beside the name of the test. As each
stage of the test is completed, the Testing... message is replaced by either
Passed or Failed.
Figure 10-1 Self test complete
When the test is complete, the result is displayed. Press to return to the
Service menu.
If the self test failed, information about the failure is displayed on the screen.
Self Test
Done

Table of Contents

Other manuals for Keysight N1911A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight N1911A and is the answer not in the manual?

Keysight N1911A Specifications

General IconGeneral
BrandKeysight
ModelN1911A
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals