Issue 5 November 2000
363-206-208
End-To-End Installation Tests for Ring Applications of the DDM-2000 OC-12 Multiplexer
Lucent Technologies - Proprietary
See Notice on first page
Final Operations
Procedure
(1) Verify that all test signals and loopbacks from the DDM-2000 OC-12 have been
removed.
(2) Press the UPD push-button on the SYSCTL.
(3) Verify that the system is configured for normal operation and that no alarms are
present (that is, no FAULT LED lighted on any circuit pack). If alarms are
present, refer to the “Troubleshooting” section of this manual.
(4) Connect the office alarm cables if they have been disconnected.
(5) Clear the OC-12 shelf of all provisioning by issuing the command:
init-sys:all; (INTIALIZE SYSTEM).
The init-sys command is a privileged user command and thus the appropri-
ate login is necessary. Refer to the “Login Procedure” section in Chapter 6 on
page 6-7.
(6) Terminate communication to the shelf with the logout command.