Crane operation
11.1 Before operating the crane
Operating manual 3 302 709 en 11 - 3
GMK5150L
12.01.2018
9. Check the position of the hoist ropes; Ã p. 11 - 6.
10. Compare current rigging mode with the
RCL display – enter and con-
firm current rigging mode, if necessary;
à p. 11 - 32.
11. Check telescoping;
à Inspections prior to starting operations, p. 11 - 97.
12. – Switch off the slewing gear for 0° and 180° working positions –
symbol (1) red;
à p. 11 - 120.
– Switch off houselock (if fitted) for other working positions –
symbol (2) red;
à p. 11 - 19.
13. Check the electrical system for correct operation;
à p. 11 - 7.
s