Crane operation
11.5 Crane operation with main boom
11 - 104 3 302 709 en Operating manual
GMK5150L
12.01.2018
Unlocking
• Select and confirm the symbol (1).
The locking pins (2) retract.
–Yellow: Intermediate position
–Red: Unlocked – symbol (3) displayed