Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 6 3 302 709 en Operating manual
GMK5150L
12.01.2018
25. Enter and confirm the current rigging mode; à Enter rigging mode,
p. 11 - 32.
26. With the rigging mode adjusted accordingly, rig the counterweight
combination required for the operation according to
Lifting capacity
table
; à CHECKLIST: Rigging the counterweight, p. 12 - 77.
27. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à Enter rigging mode, p. 11 - 32.