Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 709 en 12 - 5
GMK5150L
12.01.2018
19. Pick up the hook block and re-reeve the hoist rope, if necessary;
à Hook block on a separate vehicle, p. 12 - 117,
à Hook block on the bumper, p. 12 - 115,
à Reeving and unreeving the hoist rope, p. 12 - 124.
20. Install lifting limit switch;
à p. 12 - 139.
21. Install the anemometer and if necessary the air traffic control light;
à Anemometer and air traffic control light, p. 12 - 145.
22. Install the camera on main boom if required;
à Cameras for crane
operation
, p. 12 - 152.
23. Fold out and adjust all mirrors for crane operation;
à p. 12 - 150.
24. Perform all the required checks prior to crane operation;
à CHECKLIST: Checks before operating the crane, p. 11 - 1.
s

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK5150L and is the answer not in the manual?

Manitowoc GROVE GMK5150L Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK5150L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals