Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 4 3 302 709 en Operating manual
GMK5150L
12.01.2018
13. Earth the truck crane, if necessary; Ã Earthing the truck crane, p. 12 - 15.
14. Inspect the truck crane, while looking out in particular for any leaking
fluids (oil, fuel or water).
15. Extend the step if necessary;
à p. 12 - 157.
16. Fold out the railing on the turntable;
à p. 12 - 149.
17. Start the engine for crane operation;
à p. 10 - 3.
18. Unlock the turntable and if necessary switch off the houselock;
à Unlocking the superstructure, p. 11 - 16,
à Switching off the houselock, p. 11 - 19.