Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating manual 3 302 709 en 12 - 3
GMK5150L
12.01.2018
H
The following points only apply when rigging the truck crane on outriggers.
To continue rigging in the
Free on wheels working position, continue the
checklist at point 12.
8. Check whether the ground will support the maximum occurring outrig-
ger pressures;
à Determining the required load-bearing area, p. 12 - 11.
9. Deactivate (Lock) the suspension – symbol red (suspension off);
à p. 5 - 17.
10. Support the truck crane with the outrigger span required for the job
according to the
Lifting capacity table and raise until none of the wheels
is touching the ground;
à Outrigger operation, p. 12 - 41.
11. Align the truck crane horizontally;
à p. 12 - 60.
12. Switch off the engine
s