Rigging work
12.10 Rigging work on the main boom
12 - 118 3 302 709 en Operating manual
GMK5150L
12.01.2018
Picking up the
hook block
Depending on the driving mode, the hook block can be placed on a separate
vehicle;
à Driving modes, p. 6 - 1.
If the respective setting has been made in
the RCL, slew the superstructure and lower
the main boom until the boom head is
directly above the hook block (1).
Unreel the hoist rope.
Reeve the hoist rope into the hook block (1);
à Reeving and unreeving the hoist rope,
p. 12 - 124.
Raise the hook block off the separate
vehicle.
Setting down
the hook block
Depending on the driving mode, the hook block must be set down on
a separate vehicle;
à Driving modes, p. 6 - 1.
With the RCL set accordingly, fully retract
the main boom.
Raise the hook block until it is about 1 m
(3.3 ft) below the main boom.
Lower the main boom and set the hook
block (1) down on the separate vehicle.