Loading...
Rigging work
12.10 Rigging work on the main boom
Operating manual 3 302 709 en 12 - 119
GMK5150L
12.01.2018
Detach the lifting limit switch weight (2)
from the hoist rope;
à p. 12 - 142.
Unreeve the hoist rope; à p. 12 - 131.
Secure the hook block (1) for transport.
Set down the main boom on the boom rest.
Fastening the hoist rope to the bumper
Do not attach the rope end clamp to the front towing coupling! The towing
coupling must be free for a tow-rod in emergencies.
Attach the rope end clamp to the retaining
rope (1).
Pull the hoist rope slightly taut.
Fasten the lifting limit switch weight to the
hoist rope.
The hoist rope and lifting limit switch weight
are now secured for driving.